The IRMA Community
Newsletters
Research IRM
Click a keyword to search titles using our InfoSci-OnDemand powered search:
|
A Practical Approach to Visualizing Different Phases of Project Management Using MSProject
|
|
Author(s): Hrithik Raj (Amity University, India), Ritu Punhani (Amity University, India)and Ishika Punhani (University of Petroleum and Energy Studies, India)
Copyright: 2023
Pages: 31
Source title:
Applying AI-Based IoT Systems to Simulation-Based Information Retrieval
Source Author(s)/Editor(s): Bhatia Madhulika (Amity University, India), Bhatia Surabhi (King Faisal University, Saudi Arabia), Poonam Tanwar (Manav Rachna International Institute of Research and Studies, India)and Kuljeet Kaur (Université du Québec, Canada)
DOI: 10.4018/978-1-6684-5255-4.ch001
Purchase
|
Abstract
This chapter discusses the problems of project preparation, project planning, project execution, and monitoring of a real-world project. Emphasis is placed on MS Project – a software product designed to create plans, projects, and schedules as well as control and management of their implementation. It is discussed in a practical manner its ability to understand how much time and work developers are investing in a software project. As a result, the project management actions helped the project be delivered on time without compromising any time, budget, or resource constraints. The authors considered different scenarios related to project risk. They used the project crashing technique, and the time of the project was significantly reduced allowing the project to finish on time. The relations between the activities, the resources, and the time for their implementation are defined. The effectiveness of using different types of calendars—standard and continuous—specific to the continuous mining activities is evaluated.
Related Content
|
Hrithik Raj, Ritu Punhani, Ishika Punhani.
© 2023.
31 pages.
|
|
Divi Anand, Isha Kaushik, Jasmehar Singh Mann, Ritu Punhani, Ishika Punhani.
© 2023.
21 pages.
|
|
Jayanthi G., Purushothaman R..
© 2023.
10 pages.
|
|
Anshika Gupta, Shuchi Sirpal.
© 2023.
14 pages.
|
|
Reet Kaur Kohli, Seneha Santoshi, Sunishtha S. Yadav, Vandana Chauhan.
© 2023.
13 pages.
|
|
Poonam Tanwar.
© 2023.
14 pages.
|
|
Monika Mehta, Shivani Mishra, Santosh Kumar, Muskaan Bansal.
© 2023.
16 pages.
|
|
|