The IRMA Community
Newsletters
Research IRM
Click a keyword to search titles using our InfoSci-OnDemand powered search:
|
When Supply Chain Strategy Does not Match Supply Chain Capabilities: Lessons that can be Learnt from the Supply Chain of Boeing 787
Author(s): Narasimha Lamba (University of Massachusetts, USA)and Ehsan Elahi (University of Massachusetts, USA)
Copyright: 2012
Pages: 19
EISBN13: 9781466617056
Purchase
View Sample PDF
Abstract
During the early 2000s, the Boeing Company was experiencing a market shrink due to a downturn in the aerospace industry after the 9/11 terrorist attacks, as well as severe competition from its rival Airbus. To deal with the situation and salvage its market share, Boeing proposed the design of a new aircraft called Boeing 787 or the Dreamliner. This futuristic aircraft was received very well by the airlines. Very soon, it became the fastest-selling new airplane in the history of commercial aviation. Nevertheless, after the initial successful launch, the company faced many supply-chain-related problems, which resulted in repeated delays and huge extra costs. These delays (now more than two and a half years) could add up to as long as three years. In this research, the authors investigate how the mismatch between the supply-chain capabilities and the Boeing’s strategy for developing this airplane led to these delays and extra costs.
Related Content
Navpreet Kaur Sidhu, Devesh Bathla, Sandhir Sharma, Harpreet Singh Bhatia.
© 2023.
14 pages.
|
Annaki Fouad, Igamane Saad Eddine, Ouassou Sara.
© 2025.
24 pages.
|
Hafez Salleh, Eric Lou.
© 2012.
30 pages.
|
Frank Q. Fu, Hong Yi, Yuan Zheng, Lidan Li, Xiangjiang Wang, Xiumei Zhang.
© 2020.
19 pages.
|
Jean Michel Rocchi.
© 2022.
23 pages.
|
|
|