IRMA-International.org: Creator of Knowledge
Information Resources Management Association
Advancing the Concepts & Practices of Information Resources Management in Modern Organizations

Risk Evaluation of EPC Supply Chain Based on SCOR and Multi-Level Grey Model: A Case Study of China's Waste Incineration Plant Project

Risk Evaluation of EPC Supply Chain Based on SCOR and Multi-Level Grey Model: A Case Study of China's Waste Incineration Plant Project
View Sample PDF
Author(s): Cao Liang (Hohai University, China), Feng Jingchun (Hohai University, China)and Ren Yuan (Shanghai Dianji University, China)
Copyright: 2020
Pages: 24
Source title: Supply Chain and Logistics Management: Concepts, Methodologies, Tools, and Applications
Source Author(s)/Editor(s): Information Resources Management Association (USA)
DOI: 10.4018/978-1-7998-0945-6.ch076

Purchase


Abstract

With the development of China's economy, large-scale engineering and complex engineering are emerging. The Engineering Procurement Construction (EPC) project general contracting model is widely used in civil engineering, water conservancy, railway, water treatment, waste incineration plants and other large engineering area. The increasing complexity of construction technology and the risks are facing overwhelming and fragile supply chain. Based on the deep analysis of supply chain operation reference (SCOR) model, which is widely used in various fields of industry, this article puts forward the preliminary index system of supply chain risk of EPC project by analytic hierarchy process (AHP). The risk index system of waste incineration project including 5 first-level risk indicators and 27 second-level risk indicators has been established and determined. The multi-level grey model is used to evaluate the risk index, calculate the grey evaluation coefficient and the grey evaluation weight vector as well as the weight matrix, draw the specific risk evaluation value of the project, and sort the first level index. Finally, an EPC example of a waste incineration in Hubei Province is used to verify the feasibility and reliability of the method.

Related Content

Hamed Nozari. © 2024. 13 pages.
Maryam Rahmaty. © 2024. 13 pages.
Mahmonir Bayanati. © 2024. 13 pages.
Kamalendu Pal. © 2024. 33 pages.
Kamalendu Pal. © 2024. 35 pages.
Aminmasoud Bakhshi Movahed, Ali Bakhshi Movahed, Hamed Nozari. © 2024. 31 pages.
Esmael Najafi, Iman Atighi. © 2024. 11 pages.
Body Bottom