The IRMA Community
Newsletters
Research IRM
Click a keyword to search titles using our InfoSci-OnDemand powered search:
|
Analysis of Risk and Reliability in Project Delivery Methods
Abstract
Risk and reliability are two main factors that must be studied in order to measure the successful rate of a project. As a result, innovative project delivery methods have been proposed to mitigate the risk and improve reliability of a project. The intent of this study is to compare the use of the Analytical Hierarchical Process (AHP) and fuzzy AHP for decisions surrounding the early stages of construction projects based on risk and reliability measures. Financial risk is especially high during the early design stages of a project due to the unknown obstacles that will follow. The case study uses the selection of a project delivery method as an example, and provides a sample project to highlight the project-specific variability of the multi-criteria decision analysis.
Related Content
Fani Antoniou, Marina Marinelli, Kleopatra Petroutsatou.
© 2024.
31 pages.
|
Konstantinos Kirytopoulos, Vasileios Sarlis, Dimitris Marinakis, Theodoros Kalogeropoulos.
© 2024.
26 pages.
|
Konstantina Ragazou, Ioannis Passas, Alexandros Garefalakis, Constantin Zopounidis.
© 2024.
24 pages.
|
Vannie Naidoo, Rajen Chetty.
© 2024.
19 pages.
|
Alexandros E. Grigoras, Georgios N. Aretoulis, Fani Antoniou, Stylianos Karatzas.
© 2024.
30 pages.
|
Kleopatra Petroutsatou, Theodora Vagdatli, Marina Chronaki, Panagiota Samouilidou.
© 2024.
24 pages.
|
Dimitra Korakaki, Stratos Kartsonakis, Evangelos Grigoroudis, Constantin Zopounidis.
© 2024.
34 pages.
|
|
|