The IRMA Community
Newsletters
Research IRM
Click a keyword to search titles using our InfoSci-OnDemand powered search:
|
Evaluation of Key Metrics for Performance Measurement of a Lean Deployment Effort
Abstract
To meet customer’s needs for high-quality goods and avoiding risks of product-liability, global firms continually evaluate the performance of their supply chain for optimum design. Lean management is one of the key techniques businesses adopt in redesigning their processes. The technique is a vital strategy to increase productivity and effectiveness with respect to the movement of goods. Multivariate Analysis of Variance (MANOVA) was utilized to evaluate the performance of work cell, shift, worker’s experience, and kaizen event participation level during a lean enterprise deployment effort at a multinational organization. The significance of the effects of these variables were assessed based on various lean supply chain factors such as First In First Out (FIFO), Setup Wheel System (SWS), Standard Operating Procedures (SOP), Clip System(CS), and Key Performances Indicators (KPI). The results support the criticality of metrics and their impact in implementing a lean manufacturing process in a global supply chain environment.
Related Content
Poshan Yu, Zixuan Zhao, Emanuela Hanes.
© 2023.
29 pages.
|
Subramaniam Meenakshi Sundaram, Tejaswini R. Murgod, Madhu M. Nayak, Usha Rani Janardhan, Usha Obalanarasimhaiah.
© 2023.
20 pages.
|
Rekha R. Nair, Tina Babu, Kishore S..
© 2023.
23 pages.
|
Wasswa Shafik.
© 2023.
22 pages.
|
Jay Kumar Jain, Dipti Chauhan.
© 2023.
24 pages.
|
George Makropoulos, Dimitrios Fragkos, Harilaos Koumaras, Nancy Alonistioti, Alexandros Kaloxylos, Vaios Koumaras, Theoni Dounia, Christos Sakkas, Dimitris Tsolkas.
© 2023.
19 pages.
|
Shouvik Sanyal, Kalimuthu M., Thangaraja Arumugam, Aruna R., Balaji J., Ajitha Savarimuthu, Chandan Chavadi, Dhanabalan Thangam, Sendhilkumar Manoharan, Shasikala Patil.
© 2023.
17 pages.
|
|
|