Cost Performance Estimation in Construction Projects Using Fuzzy Time Series
|
Author(s): Mostafa Salari (Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran), Nooshin Yousefi (Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran)and Mohhmad Mahdi Asgary (Department of System Engineering, University of Economic Sciences, Tehran, Iran)
Copyright: 2015
Volume: 6
Issue: 1
Pages: 10
Source title:
International Journal of Information Technology Project Management (IJITPM)
Editor(s)-in-Chief: John Wang (Montclair State University, USA)
DOI: 10.4018/ijitpm.2015010104
Purchase
|
Abstract
In this paper, the authors develop a model to estimate future performance of construction projects. For the purpose of estimation, fuzzy times series models are used as an effective approach in estimation process. Furthermore, linguistic terms are applied to interpret the fuzzy-based results. The proposed model can assists project managers to develop their knowledge concerning the future aspects of project cost performance. It also provides the early warning of weak upcoming performance of project and extends the feasible time for corrective actions. Eventually, a small example has been provided to illustrate how the new model can be implemented in reality.
Related Content
Zhi Chen, Jie Liu, Ying Wang.
© 2024.
19 pages.
|
Ping Zhang, Changrong Lv, Qingying Li, Bori Cong, Jian Liu.
© 2024.
19 pages.
|
Lai Xin, Liang Chang Sheng, Jiayu Feng, Hengyan Zhang.
© 2024.
17 pages.
|
Abida Ellahi, Yasir Javed, Mohammad Farooq Jan, Zaid Sultan.
© 2024.
20 pages.
|
Tongyue Feng, Jiexiang Xu, Zehan Zhou, Yilang Luo.
© 2024.
21 pages.
|
Toby Chau, Helen Lv Zhang, Yuyue Gui, Man Fai Lau.
© 2024.
13 pages.
|
Andrew J. Setterstrom, Jack T. Marchewka.
© 2024.
22 pages.
|
|
|